You're holding Evergy, Inc. (EVRG) in your portfolio or looking to understand its 2025 trajectory, and you need to know what truly moves the needle. Forget market noise; for a utility like Evergy, the entire investment thesis boils down to two things: securing favorable rate case approvals from the Kansas Corporation Commission (KCC) and the Missouri Public Service Commission (MoPSC) to fund a multi-billion dollar grid modernization CapEx program. Political pressure on customer bill affordability is defintely high, but the company's commitment to an 80% reduction in carbon emissions by 2035 means this spending is non-negotiable. We'll break down the Political, Economic, Sociological, Technological, Legal, and Environmental forces to give you a clear, actionable view on where Evergy's next dollar of earnings will come from.
Evergy, Inc. (EVRG) - PESTLE Analysis: Political factors
State regulatory bodies (KCC, MoPSC) control rate case approvals and allowed return on equity (ROE).
The regulatory environment in Kansas and Missouri is the single most critical political factor for Evergy, Inc.'s financial health. The Kansas Corporation Commission (KCC) and the Missouri Public Service Commission (MoPSC) are the gatekeepers for rate case approvals, which defintely dictate the company's revenue and its allowed Return on Equity (ROE) for shareholders.
In September 2025, the KCC approved a rate increase for Evergy Kansas Central, granting $128 million in new annual revenue. This was a win for the company, but it was substantially less than the $196.4 million Evergy originally requested when the case was filed in January 2025. This difference of over $68 million shows the political and regulatory friction inherent in the process. The KCC also set a 9.7% ROE for Transmission Delivery Charges (TDC) to cover transmission system costs, a number one commissioner called excessive, highlighting the ongoing political tension over investor returns versus customer costs.
Here is a quick look at the 2025 Kansas Central Rate Case outcome:
| Metric | Evergy Original Request (Jan 2025) | KCC Approved Settlement (Sept 2025) |
|---|---|---|
| Base Rate Increase (Retail Revenue) | $196.4 million | $128 million |
| Requested ROE (Base Rate) | 10.5% | N/A (Settlement) |
| Approved ROE (TDC) | N/A | 9.7% |
| Average Residential Bill Impact (900 kWh) | N/A | ~$8.47 per month increase |
Political pressure in Kansas and Missouri to manage customer bill affordability is defintely high.
Affordability is a major political flashpoint, especially in a high-inflation environment. The pressure from consumers and state lawmakers in both Kansas and Missouri to keep bills low is immense, and it directly influences regulatory decisions.
For example, the KCC's September 2025 approval of a $128 million rate hike was immediately scrutinized because it translates to an average monthly increase of about $8.47 for a residential customer using 900 kWh. One commissioner's partial dissent, which specifically cited the 9.7% ROE as excessive and a risk to affordability for vulnerable customers, is a clear signal of this political pressure.
The issue is even more acute in Missouri due to new legislation. The MoPSC's July 2025 approval of new gas and solar plants, enabled by Senate Bill 4, allows Evergy to use Construction Work In Progress (CWIP). This means customers start paying for the plants before they are operational. This approach is highly controversial, as it shifts the financial risk from shareholders to ratepayers, with the total cost for Missouri customers alone exceeding $2.4 billion for the new gas and solar projects. That's a huge political risk for the utility.
Government incentives and mandates drive renewable energy adoption and coal plant retirement schedules.
While federal incentives like the Inflation Reduction Act (IRA) are a huge financial tailwind, state-level political mandates and the regulatory review of Evergy's Integrated Resource Plans (IRPs) are what dictate the pace of the energy transition.
In 2025, Evergy's IRP updates for both Kansas and Missouri signaled a significant political pivot toward reliability over aggressive decarbonization. The company delayed the retirement of several coal units, keeping combined capacity of 914 MW of high-polluting coal online for years longer than previously planned. This move is a direct response to political and market pressure for grid reliability, but it drew immediate criticism from environmental groups like the Sierra Club.
The company's capital plan still includes a massive investment in clean energy, but the political reality of coal retirement delays is a key factor in its 2025 strategy:
- Lawrence Energy Center (480 MW) retirement delayed from 2028 to 2032.
- Evergy Metro/Missouri West coal retirements, including parts of the Jeffrey Energy Center, delayed by at least one year.
- New generation additions approved by MoPSC in July 2025 include a 107-MW solar facility in Missouri and a 65-MW solar facility in Kansas, alongside new natural gas plants.
Utility-specific legislation on infrastructure spending and grid resilience is a constant factor.
Legislative action in Jefferson City (Missouri) and Topeka (Kansas) provides the framework for Evergy's massive capital spending plans. The company is executing a $17.5 billion capital investment plan from 2025 to 2029, with a significant portion dedicated to grid modernization and resilience.
The most impactful piece of recent legislation is Missouri's Senate Bill 4 (SB4). This bill, which allows for CWIP, is a political game-changer because it provides a mechanism for Evergy to recover a portion of its investment costs during construction, not just after a project is finished. This regulatory tailwind makes large-scale infrastructure projects, such as the new gas and solar generation, more financially viable for the utility. The KCC's approval of the $128 million rate increase in Kansas was also explicitly linked to recovering costs for replacing aging equipment and improving grid reliability.
Furthermore, the political focus on grid resilience is expanding to new areas. In November 2025, the MoPSC requested utilities to detail wildfire mitigation plans. Evergy is developing its plan, with a draft expected by the end of 2025, which will involve infrastructure upgrades like replacing old conductors and installing more fire-resistant poles. This shows how political and regulatory attention is constantly creating new, mandatory spending requirements for utilities.
Evergy, Inc. (EVRG) - PESTLE Analysis: Economic factors
Capital expenditure (CapEx) for grid modernization is expected to be a multi-billion dollar program through 2025.
You can't run a 21st-century utility with a 20th-century grid, and Evergy, Inc. is putting serious capital to work to fix that. The company's long-term strategy is anchored by a massive $17.5 billion capital investment plan spanning 2025 through 2029. This spending is the engine for their anticipated annualized rate base growth of approximately 8.5% over the same period, which is how a regulated utility grows its earnings.
For the fiscal year 2025, a significant portion of this spending is dedicated to modernizing the distribution system (grid modernization) and adding new generation capacity to meet surging load. More than 45% of the total 2025 capital spend will go directly toward grid modernization efforts, replacing aged infrastructure and deploying enhanced automation. In 2024, the company executed a $2.3 billion capital investment plan, setting the stage for the current multi-year program.
Here's the quick math on the investment drivers for the 2025-2029 plan:
- Total Capital Investment (2025-2029): $17.5 billion
- Financing from Incremental Debt: $5.8 billion
- Financing from Equity/Equity-like Securities: $2.8 billion
- Cash from Operations (Expected): $12.5 billion
Rising interest rates increase the cost of debt, impacting the overall cost of capital for new projects.
The economic reality of higher interest rates is a headwind for any capital-intensive business, especially a utility that funds its CapEx with debt. Evergy's financing plan for its $17.5 billion investment includes securing an incremental $5.8 billion in debt through 2029. The higher interest rate environment directly translates to a greater cost of debt, which must be recovered through rates, but it also increases the financial risk and carrying costs of new projects.
We saw this impact directly in the 2025 quarterly results. In the first quarter of 2025, the positive impact from the recovery of regulated investments was partially offset by a $0.10 decrease in Earnings Per Share (EPS) due to increased depreciation, amortization, and interest expenses. Similarly, the second quarter of 2025 saw a negative impact from increased interest expense, along with higher depreciation and amortization. That's a clear drag on earnings, even with supportive regulatory mechanisms in place.
Slowing regional economic growth in parts of the service territory could limit demand growth.
While the overall narrative for Evergy's service territory is one of robust, large-scale economic development, the underlying residential and legacy industrial demand shows a more nuanced, sometimes soft, picture. The company is experiencing a significant economic development pipeline of over 15 gigawatts (GW), with a Tier 1 opportunity of 4-6 GWs of large new customer load. This includes major projects like the new Lambda AI factory and data center in Kansas City, expected to start with 24 megawatts (MW) and potentially scale above 100 MW.
However, the general retail segment has shown weakness. When normalized for weather, total retail demand in the first quarter of 2025 declined by 3.0%. The industrial sector, in particular, has seen a concerning slowdown, with industrial retail sales showing an 8.1% decrease in the second quarter of 2025, which was partially attributed to an unplanned customer maintenance shutdown. The company's weather-normalized demand growth for the full year 2025 is still forecasted at 2.4%, largely driven by the commercial and large customer segments.
| Customer Segment | Q2 2025 Revenue ($M) | Q2 2024 Revenue ($M) | Year-over-Year Change (%) |
|---|---|---|---|
| Residential | 491.9 | 536.7 | (8.3) |
| Commercial | 467.6 | 485.8 | (3.7) |
| Industrial | 160.5 | 174.7 | (8.1) |
| Total Electric Retail | 1,130.7 | 1,207.4 | (6.4) |
Inflation in labor and materials puts upward pressure on operating and maintenance (O&M) costs.
Inflationary pressures on the cost of labor, equipment, and raw materials continue to challenge Evergy's Operating and Maintenance (O&M) budget. For the second quarter of 2025, the O&M expense was $255.1 million, representing a 7.3% increase compared to the $237.7 million recorded in the second quarter of 2024. This rise in spending reduced second-quarter EPS by $0.05 compared to the prior year.
To be fair, management has shown discipline in controlling these costs. Despite the year-over-year increase, the O&M expense for the second quarter came in on plan, and the company expects to come in under budget for O&M for the full year 2025. This suggests successful internal mitigation efforts against external price inflation, but the underlying cost pressure remains a factor in rate case filings.
Evergy, Inc. (EVRG) - PESTLE Analysis: Social factors
Public demand for clean energy and environmental stewardship is increasing, pressuring the generation mix
You are seeing a clear, sustained social demand for a cleaner energy mix, and this is putting Evergy, Inc. under significant public and regulatory scrutiny. The company has made progress, with carbon emissions reduced by 53 percent from 2005 levels as of 2023, and roughly half of the power provided to customers today coming from carbon-free sources, including nuclear and renewables. That's a strong starting point.
But here's the quick math: Evergy's latest 2025 Integrated Resource Plan (IRP) shows a pivot that directly conflicts with this public demand. The plan reduces the projected renewable energy additions to 3 GW in 2025, down from 3.5 GW in the 2022 IRP, while increasing new methane gas generation additions to more than 4.4 GW over the long term. This shift has already generated pushback from customers and environmental groups, who question the necessity and the increased costs that ratepayers will defintely face. The social license to operate hinges on balancing reliability with an aggressive clean energy transition, and this new generation mix creates a major tension point.
- Current Carbon-Free Share: ~50% of generation.
- Owned Wind Capacity: >4,500 MW.
- 2025 IRP Planned Gas Additions: >4.4 GW.
Focus on energy equity and affordability for low-income customers is a growing regulatory and social concern
Energy equity, which extends beyond just affordability to include access and participation, is no longer a niche issue; it is a central regulatory and social concern in the utility sector. For Evergy, this means managing the cost of the grid transition without disproportionately burdening low-income customers. The company recognizes this, which is why its Corporate Social Impact program secured more than $52 million in utility payment assistance and worked with over 35,000 customers face-to-face in 2022 to connect them with support.
However, the challenge is structural. Advocacy groups are pushing for the company to address the broader definition of an overburdened customer-which includes factors like race, age, and health-not just income. The social expectation is for utility programs to move past simple bill assistance toward comprehensive energy efficiency and weatherization measures that permanently reduce the energy burden for these vulnerable populations. This is a critical risk area, as cost increases tied to new generation projects will inevitably amplify the affordability debate.
| Energy Equity Metric | Most Recent Data (2022) | Social/Regulatory Implication |
|---|---|---|
| Utility Payment Assistance Secured | >$52 million | Mitigates immediate financial hardship for vulnerable customers. |
| Customers Assisted (Face-to-Face) | >35,000 | Shows direct engagement but highlights the scale of the energy burden issue. |
| Program Focus | Weatherization, Multi-family upgrades, LIEAP. | Needs to expand beyond income-only criteria to address broader energy equity factors. |
Customer expectations for digital self-service and real-time outage communication are rising sharply
The ubiquity of instant digital services has fundamentally changed what customers expect from their utility. They want real-time data and self-service options, and they want them now. Evergy has a strong foundation for this, having achieved 100% smart meter penetration across its electric customer base by the end of 2023. This infrastructure is the backbone for advanced digital services.
The company has responded by pushing digital engagement hard. For instance, a recent digital education initiative for a Time-of-Use (TOU) rate transition resulted in 98 percent customer awareness of the new rate options, which is a huge win for digital adoption. Customers are also actively encouraged to use the mobile app for reporting and tracking outages and signing up for text or email alerts, a service highlighted in 2025 preparedness communications. This digital fluency is a major opportunity for Evergy to improve customer satisfaction and reduce call center load, but it also means any failure in the digital channel, particularly during a major outage, will be amplified.
Workforce demographics show a need for skilled labor to manage advanced grid technology
The energy transition is fundamentally a labor transition. As Evergy invests heavily in smart grid technologies to support its renewable portfolio and improve reliability, the demand for a new class of highly skilled technical workers is intensifying. The company's capital investment plan, raised to $17.5 billion for 2025E-2029E, includes significant spending on grid modernization, which requires a specialized workforce.
The broader energy industry is facing a major talent crunch, with some analyses projecting a lack of up to 40,000 competent workers by 2025 globally. Specifically, construction jobs, which are vital for building out clean energy infrastructure, accounted for 45% of the clean energy workforce (over 1.6 million jobs) in the U.S. in 2024, underscoring the competition for skilled trades. Evergy must actively manage the retirement wave of long-tenured employees and compete aggressively for new talent in areas like cybersecurity, data analytics, and advanced grid operations, or risk delays in its infrastructure programs.
Evergy, Inc. (EVRG) - PESTLE Analysis: Technological factors
Deployment of Advanced Metering Infrastructure (AMI) is crucial for grid efficiency and data collection
The technological foundation for Evergy, Inc.'s modernization strategy is already largely in place. You should know that the company has essentially completed its Advanced Metering Infrastructure (AMI), or smart meters, deployment. This isn't a future project; it's a realized asset. As of the end of 2025, the Percent of Total Electric Customers with Smart Meters is reported at 100%.
This full deployment, covering Evergy's 1.7 million customers across Kansas and Missouri, shifts the focus from installation cost to data utilization. The immediate opportunity is using this two-way communication to manage peak demand and customer behavior. For example, the successful transition of residential customers in Missouri to various time-of-use (TOU) rate options by the end of 2023 was only possible because the smart meter infrastructure was ready to provide the necessary granular data. This is defintely a high-value asset, allowing for better load forecasting and faster outage detection.
Integration of intermittent renewable sources requires sophisticated battery storage and transmission upgrades
The push for cleaner energy is a massive technological driver, but intermittent sources like wind and solar create a complex stability challenge for the grid. The technology solution is two-fold: new generation and energy storage. Evergy's 2025 Integrated Resource Plan (IRP) is targeting the addition of 624 MW of new solar resources by 2025.
To manage that new, variable power, sophisticated battery storage is mandatory. The company models utility-scale battery storage resources in 150 MW blocks for capacity expansion planning. While utility-scale projects are ramping up, Evergy is actively testing distributed energy resource (DER) management through its Home Battery Storage Pilot program, which provides participants with a FREE 16 kWh home battery system valued at $18,000. This pilot is critical for learning how to orchestrate thousands of small storage units to support the main grid.
Cybersecurity investment is mandatory to protect critical infrastructure from increasingly complex threats
Honestly, a smart grid is a target-rich environment for malicious actors. The increased connectivity from AMI and grid automation means the attack surface has grown exponentially. Evergy's cybersecurity and Information Technology (IT) risk mitigation program is a continuous, non-negotiable expense, grounded in compliance with the North American Electric Reliability Corporation (NERC) and the National Institute of Standards and Technology (NIST) Cybersecurity Framework.
The capital outlay for this protection is substantial and is captured within the broader IT and General Facilities budget. Here's the quick math on the technological CapEx for 2025:
| 2025 Capital Expenditure Category | 2025E CapEx (Millions USD) | Strategic Purpose |
|---|---|---|
| Total Capital Expenditure | $2,541 | Overall Infrastructure Modernization |
| Distribution (Grid Hardening/Automation) | $926 | Reliability and Resiliency |
| New Generation (e.g., Solar, Gas) | $501 | Resource Adequacy and Decarbonization |
| General Facilities, IT, and Other (incl. Cybersecurity) | $204 | System Security and Operational Efficiency |
Grid hardening technologies reduce outage duration and improve reliability
The largest single technological investment outside of new generation is focused squarely on making the physical grid more resilient against extreme weather and operational faults. Evergy is dedicating a significant portion of its total spending to grid modernization, with more than 45% of the 2025 capital spend going directly to these projects.
This is where the rubber meets the road for reliability. The goal is to deploy technologies that automatically detect and isolate faults, which is a major step up from manual inspection.
- Replace aged infrastructure: Upgrading power poles, overhead lines, and underground cables.
- Distribution Automation: Deploying new sensors and software (like the completed Advanced Distribution Management System) to better identify and isolate outages.
- Targeted Hardening: Investing in asset hardening and undergrounding critical assets to improve resiliency.
With a planned $926 million in Distribution CapEx for 2025, this investment is a clear action to improve reliability metrics like System Average Interruption Duration Index (SAIDI) and System Average Interruption Frequency Index (SAIFI).
Evergy, Inc. (EVRG) - PESTLE Analysis: Legal factors
Compliance with federal Environmental Protection Agency (EPA) regulations on air and water emissions requires significant investment.
The legal pressure from the Environmental Protection Agency (EPA) is a permanent cost of doing business, especially for a utility with a substantial coal-fired generation fleet. While Evergy, Inc. has made strides-reducing carbon dioxide (CO2) emissions by 57% and sulfur dioxide (SO2) by 98% compared to 2005 levels-the ongoing compliance burden is high.
The company's five-year capital expenditure (CAPEX) plan is heavily weighted toward generation resource transition and grid modernization, which directly addresses future environmental mandates. For the 2025 fiscal year, Evergy's total projected annual capital expenditures stand at approximately $2,336.6 million. A portion of this is for managing existing environmental liabilities, such as the proper closure of coal ash storage sites, which falls under the federal Coal Combustion Residuals (CCR) rule.
You can't afford to be defintely sloppy with these rules; a previous settlement with the EPA over CCR non-compliance at the retired Tecumseh Energy Center resulted in a civil penalty of $120,000 and required costly actions like installing additional groundwater monitoring wells. That's a clear signal that the regulatory body is watching closely.
Ongoing rate case filings in both Kansas and Missouri are the primary legal battlegrounds for revenue recovery.
Rate cases are the legal mechanism for a regulated utility to recover its capital investments and operating costs, plus a fair return for shareholders. This process is the single most critical legal and financial event each year, and the outcomes in 2025 have been mixed but constructive.
In Kansas, the Kansas Corporation Commission (KCC) case for Evergy Kansas Central was a major focus. Evergy initially requested a rate increase of $196.4 million (8.62% of retail revenues) in January 2025, largely to recover nearly $1 billion in infrastructure investment. However, the legal and regulatory process led to a proposed settlement in July 2025 for a lower increase of $128 million, which is a reduction of $68 million from the original ask. This is the reality of regulatory negotiation.
The Missouri Public Service Commission (MPSC) case for Evergy Missouri West also concluded, with new rates effective January 1, 2025. The company had sought an increase of over $104 million, but the MPSC ultimately approved a net increase to retail revenues of approximately $55 million. The difference between the requested and approved amounts shows the regulatory commissions are actively managing ratepayer impact.
| Jurisdiction | Filing Entity | Original 2025 Revenue Request (Approx.) | Approved/Settled 2025 Revenue Increase (Approx.) |
|---|---|---|---|
| Kansas | Evergy Kansas Central | $196.4 million | $128 million (Settlement) |
| Missouri | Evergy Missouri West | Over $104 million | Approximately $55 million (Approved) |
Litigation risk related to extreme weather events and grid resilience is a growing liability.
The legal exposure from service interruptions during extreme weather is a rising concern, especially as climate events become more frequent and severe. Customers and state regulators are increasingly scrutinizing utility performance during cold snaps and major storms, leading to higher litigation and regulatory risk.
The North American Electric Reliability Corporation (NERC) 2025-2026 Winter Reliability Assessment flagged the Southwest Power Pool (SPP), which includes Evergy's service area, for elevated risk of outages during extreme cold due to demand growth outpacing new supplies. This assessment provides a legal basis for regulators to demand more investment in resilience.
Evergy addresses this by prioritizing grid modernization and resilience in its capital plan, specifically to withstand extreme weather. Failure to invest prudently here can lead to lawsuits and regulatory penalties that dwarf the cost of the preventative infrastructure.
Adherence to North American Electric Reliability Corporation (NERC) standards is non-negotiable for system security.
Compliance with NERC standards is mandatory for maintaining the security and reliability of the bulk power system. Non-compliance is met with significant financial penalties from the Federal Energy Regulatory Commission (FERC) and NERC.
The legal requirement for operational security is a major driver of capital spending. Evergy's 2025 estimated capital expenditure for Transmission is $547 million, a large part of which is dedicated to meeting these reliability and security mandates. This investment is non-negotiable.
A concrete example of the cost of failure is the 2024 penalty of $122,000 Evergy faced for non-compliance with NERC's FAC-008-3 R6 standards, which relate to facility ratings. This shows that even minor deviations from technical standards carry a direct financial cost, plus the indirect cost of remediation and increased audit scrutiny.
The key NERC-driven legal compliance areas include:
- Maintaining mandatory system security for the bulk power system.
- Ensuring facility ratings (FAC) are accurate and compliant.
- Investing in transmission infrastructure to improve reliability.
Evergy, Inc. (EVRG) - PESTLE Analysis: Environmental factors
The environmental factor is a defining strategic pressure for Evergy, Inc., driving a massive capital expenditure program but also creating significant tension between decarbonization goals and near-term grid reliability.
You need to understand that Evergy's stated commitment to a clean energy transition is being complicated by the immediate, surging demand for power from large industrial customers and data centers. This conflict is forcing the company to delay coal plant retirements and invest heavily in natural gas, which is a clear, near-term environmental risk to their long-term climate targets.
Evergy aims for a significant reduction in carbon emissions, targeting a 70% reduction by 2030 from 2005 levels.
Evergy's primary environmental commitment is achieving net-zero carbon emissions by 2045, but the critical near-term milestone is a 70% reduction in owned generation carbon dioxide ($\text{CO}_2$) emissions by 2030, relative to 2005 levels. The company has already made substantial progress, reaching an approximate 50% reduction in carbon emissions relative to the 2005 baseline by the end of 2024.
To be fair, the company's 2005 baseline for total owned generation $\text{CO}_2$ emissions was 48,455,198 metric tons (MT), which was reduced to 20,644,649 MT in 2024. Hitting the 70% target by 2030 means cutting another roughly 12 million MT in the next six years, and that's a tough lift given the recent shift in their resource plan.
Here's the quick math: If Evergy can secure an allowed ROE near the 9.5%-10.0% range in its next rate cases, that makes funding the necessary CapEx much easier. If they get pushed down to 9.0% or lower, the investment thesis gets tougher, and that's your key risk.
The company is actively retiring older, less efficient coal-fired generation units.
While the long-term plan involves retiring coal units, the 2025 Integrated Resource Plan (IRP) updates show a strategic delay in the retirement of key coal-fired plants, totaling 914 MW of capacity, to maintain grid reliability and meet rising customer demand. This is a major pivot from previous plans.
For example, the retirement of the 480 MW Lawrence Energy Center coal plant has been delayed from 2028 to the end of 2032. Similarly, a 375 MW retirement for the Evergy Metro subsidiary has been pushed back from 2032 to 2033. The strategy now includes converting some coal units to natural gas, like the planned transition of Lawrence 5 to natural gas operation beginning in 2029. This avoids immediate coal retirement but introduces long-term reliance on another fossil fuel.
The table below summarizes the key changes in the coal retirement schedule announced in the 2025 IRP update:
| Coal Unit/Subsidiary | Capacity (MW) | Previous Retirement Date | New Retirement Date (2025 IRP) |
|---|---|---|---|
| Lawrence Energy Center (Evergy Kansas Central) | 480 MW | 2028 | 2032 |
| Evergy Metro Retirement | 375 MW | 2032 | 2033 |
| Evergy Missouri West Retirement | 59 MW | 2031 | 2032 |
Increased investment in wind and solar generation capacity forms the core of the clean energy transition.
Evergy has a massive \$17.5 billion capital investment plan spanning 2025 to 2029. Of this, a substantial \$6.17 billion is allocated to renewable energy projects alone, which includes grid modernization necessary for integrating intermittent sources. The near-term plan involves developing 800 MW of renewable capacity.
Still, the transition is not purely renewable. The 2025 IRP update also includes plans for over 4.4 GW of new methane gas facilities, including two new combined-cycle gas turbine (CCGT) plants near Viola and Hutchinson, Kansas. This dual-track approach-renewables plus gas-is a pragmatic, but controversial, response to reliability concerns and the need for dispatchable generation (power that can be turned on quickly). In fact, the planned renewable additions fell to 3 GW in the 2025 update, while gas additions soared.
Key CapEx for the transition in 2025 and beyond:
- Total CapEx (2025E): \$2.541 billion
- 5-Year Renewable Allocation (2025-2029): \$6.17 billion
- Planned New Gas Capacity (2025 IRP): Over 4.4 GW
Managing coal ash and other waste products from legacy plants remains a long-term environmental liability.
The handling of Coal Combustion Residuals (CCRs), or coal ash, from legacy power plants continues to be a material long-term liability for Evergy. The company is subject to federal regulations under the Environmental Protection Agency's (EPA) CCR program, which mandates closure of certain disposal units and requires corrective action for groundwater contamination.
Evergy has recorded Asset Retirement Obligations (AROs) on its balance sheet to account for the estimated cost of closing ash disposal units. However, the August 2025 10-Q filing notes that the cost to comply with the EPA's expanded CCR regulations, particularly those focused on legacy surface impoundments, could be material, and the company is unable to accurately assess the full financial impact yet. This means the recorded AROs may be insufficient if more stringent remediation is required.
Next step: Finance: Model the sensitivity of Evergy's projected 2026 earnings per share (EPS) to a 50 basis point change in the allowed ROE by the end of the month.
Disclaimer
All information, articles, and product details provided on this website are for general informational and educational purposes only. We do not claim any ownership over, nor do we intend to infringe upon, any trademarks, copyrights, logos, brand names, or other intellectual property mentioned or depicted on this site. Such intellectual property remains the property of its respective owners, and any references here are made solely for identification or informational purposes, without implying any affiliation, endorsement, or partnership.
We make no representations or warranties, express or implied, regarding the accuracy, completeness, or suitability of any content or products presented. Nothing on this website should be construed as legal, tax, investment, financial, medical, or other professional advice. In addition, no part of this site—including articles or product references—constitutes a solicitation, recommendation, endorsement, advertisement, or offer to buy or sell any securities, franchises, or other financial instruments, particularly in jurisdictions where such activity would be unlawful.
All content is of a general nature and may not address the specific circumstances of any individual or entity. It is not a substitute for professional advice or services. Any actions you take based on the information provided here are strictly at your own risk. You accept full responsibility for any decisions or outcomes arising from your use of this website and agree to release us from any liability in connection with your use of, or reliance upon, the content or products found herein.